Laserfiche WebLink
T <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. A <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />All of the above Structural Fill material was placed, compacted, and graded per the project plans <br />and specifications. <br />Subgrade: <br />Phase 1 areas dozed to finished grade were compacted per project plans and specifications. <br />See attached figure for approved subgrade. <br />Soil Liner Fill: <br />Cat dozers placed SLF between stations G0+00 to G6+00 and E0+00 to E3+00. <br />Cat dozer placed SLF downslope of stations FM10+00 to FM14+00 and DDO+00 to D11+00. Cat <br />smooth drum rollers compacted the SLF surface. <br />Cat dozers placed SLF upslope of ADR Haul Road stations 12+00 to 16+00. A Cat excavator <br />with a vibratory plate and roller attachment smoothed the surface in preparation for <br />geomembrane deployment. A Cat smooth drum roller compacted the SLF surface. <br />All of the above Soil Liner Fill material was placed, compacted, and graded per the project plans <br />and specifications. Moisture content, density testing and depth verification were performed per <br />project specification prior to surface acceptance and geomembrane installation. <br />See attached figure for approved SLF. <br />Drain Cover Fill: <br />Cat 740 haul trucks transported DCF from the stockpile to Phase 1. Low ground pressure Cat <br />dozers placed DCF on approved geomembrane in Phase 1. <br />See attached figure for approved DCF. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: None. <br />Tertiary Underdrain: None. <br />Leak Detection: <br />None. <br />Miscellaneous: <br />Amec personnel continued LVSCS pump monitoring and observation. <br />