My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-05_REVISION - M2010071
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010071
>
2015-08-05_REVISION - M2010071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:33:16 PM
Creation date
8/12/2015 4:04:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010071
IBM Index Class Name
Revision
Doc Date
8/5/2015
Doc Name
Application AM01
From
City of Lafayette
To
DRMS
Type & Sequence
AM1
Email Name
MAC
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.5 Exhibit E - Reclamation Plan <br />a) Description of the Type of Reclamation <br />The site will be reclaimed to developed water resource and will construct two <br />additional water storage reservoirs Reservoir #2 and Reservoir #4, which <br />correspond to Cells 2 and 4 respectively. Reservoir #2 shall have a normal pool <br />water surface area of approximately 32 acres and Reservoir #4 will have a <br />normal pool water surface area of approximately 24 acres. Both reservoirs will be <br />constructed with a compacted clay liner around the perimeter of the mining <br />highwall as shown in Figure 6.4.5 — 1 Typical Section, and Exhibit F, Sheets 1-4. <br />No slurry wall will be constructed as indicated in the previous permit application. <br />Reclamation Earthwork/Compacted Clay Liner Construction <br />A summary table of reclamation earthwork volumes, areas and lengths is given <br />as Table 6.4.5-1. <br />Table 6.4.5-1. Reclamation Earthwork Summary <br />CELL 2 30-45ft deep <br />ITEM VOLUMES LENGTH AREAS <br />Total Embankment 163,040.00 yd <br />Clay Liner 90,507.25 yd <br />Slope fill 76,550.00 yd <br />Keyway Volume 4017.25 yd <br />Keyway Length 4338.63 ft <br />Pit Floor Area 150,390.76 yd <br />Pit Floor Area 31.13 ac <br />Pit Floor Depth of Excavation 1.81 ft <br />Topsoil / Revegetation Replacement <br />Area 34,061.02 yd
The URL can be used to link to this page
Your browser does not support the video tag.