My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-05_REVISION - M2010071
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010071
>
2015-08-05_REVISION - M2010071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:33:16 PM
Creation date
8/12/2015 4:04:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010071
IBM Index Class Name
Revision
Doc Date
8/5/2015
Doc Name
Application AM01
From
City of Lafayette
To
DRMS
Type & Sequence
AM1
Email Name
MAC
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
materials processing area. The east half of Cell 4 is currently being used to <br />stockpile overburden from the west half of Cell 4. Following mining of Cell 2, the <br />east half of Cell 4 will be stripped and mined. Finally, the plant will be removed <br />from the west half and that area will be mined and hauled offsite. <br />There will be no phasing of the mining plan as indicated in the previous permit <br />application. <br />Table 6.4.4-2 Mining Timetable Summary <br />Mining Cell Mining Activity Approximate <br />Dates <br />Cell 2 Strip and Stockpile Topsoil 2013-2014 <br />Cell 2 Strip and Stockpile Overburden 2013-2016 <br />Cell 2 Mine Pit Run 2014-2017 <br />Cell 4 Strip and Stockpile Topsoil 2013-2019 <br />Cell 4 Strip and Stockpile Overburden 2013-2019 <br />Cell 4 Mine Pit Run 2016-2019 <br />f) The Nature of Deposit to be Mined and Overburden <br />The thickness of sand and gravel to be mined varies from 0-14 ft. The thickness <br />of overburden varies from 5-13 ft. The stratum underneath the sand and gravel <br />deposit is weathered claystone followed by indurated claystone. <br />g) Secondary Commodities <br />Overburden will be used as structural fill for various local construction projects. <br />h) Use of Incidental products <br />Other than structural fill identified above, no other incidental products are <br />expected to be extracted from the site. <br />i) Explosives <br />No explosives will be used
The URL can be used to link to this page
Your browser does not support the video tag.