Laserfiche WebLink
The reclamation timetable is given below, assuming that all cuts have economic viability and will be <br />mined. <br />Task # <br />Description <br />Time Needed <br />in months <br />1 <br />Strip Initial overburden from Cut 1 and place to the <br />northeast. Regrade this northeast area. <br />1.0 <br />2 <br />Mine Cut 1. Create new Pond 3 and 4. <br />0.5 <br />3 <br />Mine Cut 2. Very little overburden. <br />1.0 <br />4 <br />Create 8' gravel berm along Highway 9 ROW <br />0.5 <br />5 <br />Create Ponds 1,2,3,4 on southwest corner of permit area <br />1.0 <br />6 <br />Strip overburden from Cut 3 and place in Cut 1. <br />1.5 <br />7 <br />Mine cuts 4-48 stripping and replacing topsoil & overburden <br />in the previous cut. <br />64.5 <br />8 <br />Smooth last cut with gravel from surrounding area, create <br />lake <br />1.5 <br />9 <br />Remove trailers and tanks from camp area <br />1.0 <br />10 <br />Remove shop and processing building, conveyors, pipe- <br />lines <br />2.0 <br />11 <br />Smooth 600' gravel berm from property along Highway 9 <br />0.5 <br />12 <br />Smooth sediment ponds #1, #3 and #4 into one pond <br />0.5 <br />13 <br />Backfill Pond #2 <br />0.5 <br />14 <br />Remove all mobile equipment from site <br />0.5 <br />15 <br />Re- topsoil 23.4 acres of land from Fines Piles #2 and #3 <br />2.0 <br />16 <br />Seed and mulch 21.0 acres and place tree saplings in <br />remaining reclaimed area of 2.4 acres. <br />1.0 <br />TOTAL MONTHS (INCLUDING MINING) <br />79.5 <br />Alma Place Mine 01/15 46 <br />