completed. <br />- one 1,000 gallon AST diesel fuel tank in the pump location at Ponds 3 and 4 to service the generator <br />for the pump. This tank will be placed in a compacted earth berm area with impermeable plastic lining <br />with enough volume to trap the fuel from a full tank with 10% safety factor. <br />- portable asphalt plant with 10,000 gallon AST diesel and 20,000 AST hot mix tanks. These tanks will <br />be placed in a compacted earth berm area with impermeable plastic lining with enough volume to trap <br />the fuel from a full tank with 10% safety factor. This plant will only be on site temporarily to satisfy <br />local road jobs. It is not expected that this plant will be on site for more than 5-6 weeks per year and <br />many years will not see the plant at all. <br />- portable concrete plant with 10,000 gallon AST diesel tank. This tank will be placed in a compacted <br />earth berm area with impermeable plastic lining with enough volume to trap the fuel from a full tank <br />with 10% safety factor. <br />Many of these facilities may or may not be used at any given time. At some point, new gravel mining <br />may not occur and all gravel sales may come from washed rock from the gold processing operation. <br />The site will use all existing roads to haul the product to its final destination for the final mining de- <br />scribed in this amendment. The main road that enters the permit area from the north and extends to the <br />plant area was planned as a haul road for the gold permit and per landowner wishes, will re- main after <br />reclamation for the post -mining land use. <br />Alma Place Mine 01/15 35 <br />