Laserfiche WebLink
life of the operation. <br />Gold Placer Disturbed Area Description <br />Acreage <br />1. Mining Cut Areas <br />52.4 <br />2. Berm along Highway 9 <br />2.8 <br />3. Topsoil Stockpiles <br />2.8 <br />4. Sediment Pond Area at South end of Permit Area <br />4.4 <br />5. Prep Plant area, processing, stockpile areas <br />10.1 <br />6. Overburden Storage Area from Cut 1 <br />3.0 <br />7. Pond 3 and 4 Area <br />3.60 <br />8. Camp/Office/Fuel Storage Area <br />3.4 <br />9. Site Roads <br />2.00 <br />Total Disturbed Area <br />84.50 <br />It should be noted that this disturbed area is the total for the mine life. Only 3 cuts of 48 will be disturbed <br />at any one time since reclamation will be ongoing, therefore, the total area disturbed at any one time will <br />be these cuts plus ancillary disturbance totaling only 34.1 acres in the worst case. <br />Roads, ponds and other areas that will be left after reclamation will reduce the final area to be reclaimed. <br />Alma Place Mine 01/15 26 <br />