Laserfiche WebLink
• 2.05.4 (2) (b) RECLAMATION COST ESTIMATES FOR BOND CALCULATION <br />CEC's consist of reclamation equipment currently includes: <br />1- Scraper <br />1- Dozer <br />1— Motor Grader <br />1— Water Truck <br />1— Farm Tractor <br />Various farm implements, including a seeder, disc, spreader, sprayer, etc. <br />The Division of Reclamation, Mining & Safety (DRMS) presently provides data to, and <br />periodically updates the information in, a reclamation costs software tracking program <br />(CIRCIES). This program generates estimates of the currently anticipated reclamation costs, <br />which are subsequently used to update bonding requirement calculations. <br />Since CEC no longer employs the staff or has the specific expertise to separately develop the <br />information generated by DRMS, and because CEC is afforded the opportunity to review and <br />comment on the results developed by CIRCIES, CEC has elected to rely on DRMS to generate the <br />• "Reclamation Cost Estimates for Bond Calculation". The most recent reclamation costs <br />summary developed by CIRCIES can be found at Appendix S. <br />• <br />118 07/11 <br />