Exhibit L Reclamation Costs
<br />TABLE L-1 revised Estimated 7/31/2015
<br /># ITEM QTY UNITS UNIT COST COST
<br />A Fines Disposal Area, Detail 1, Exh. F
<br />1 reseed by broadcast 3 ac $300.00 $900.00
<br />2 apply mulch and fertilizer by hydrospray 3 ac $550.00 $1,650.00
<br />B Mine Area, Detail 2, Exh. F
<br />1 fill at 4:1 the vertical face of bench, 1000' 16667 cy $1.15 $19,167.05
<br />Haul & dump fines on half of flat second bench with
<br />2 fines, 6 acres, 8" to 12" depth, 3500' haul 6486 cy $4.10 $26,592.60
<br />3 grade out fines on second bench 6486 cy $0.55 $3,567.30
<br />Haul & dump fines on half of flat first bench with
<br />4 fines, 4 acres, 8" to 12" depth, 4500' haul 4324 cy $4.25 $18,377.00
<br />5
<br />Grade out fines on first bench
<br />4324
<br />cy
<br />$0.55
<br />$2,378.20
<br />6
<br />Haul & dump fines at east edge of bench
<br />3243
<br />cy
<br />$4.10
<br />$13,296.30
<br />7
<br />Push fines over onto post law disturbed area on
<br />east side of bench, 3 acres, 8" to 12" depth
<br />3243
<br />cy
<br />$0.55
<br />$1,783.65
<br />8
<br />Haul & dump fines on post -law disturbance at top of
<br />bench 1, 3.6 acres, 8" to 12" depth, 4500' haul
<br />2904
<br />cy
<br />$4.25
<br />$12,342.00
<br />9
<br />Hydrospray seed, fertilizer, and mulch on #1 face
<br />1.4
<br />ac
<br />$850.00
<br />$1,190.00
<br />10
<br />Drill seed, fertilizer, and straw mulch on bench, #2
<br />6
<br />ac
<br />$850.00
<br />$5,100.00
<br />11
<br />Drill seed, fertilizer, and straw mulch on bench, #4
<br />4
<br />ac
<br />$850.00
<br />$3,400.00
<br />12
<br />Hydrospray seed, fertilizer, and mulch on post -law
<br />area of #7
<br />3
<br />ac
<br />$850.00
<br />$2,550.00
<br />13
<br />Hydrospray seed, fertilizer, and mulch on top of
<br />bench 1 of #8
<br />3.6
<br />ac
<br />$850.00
<br />$3,060.00
<br />14
<br />Remove water tank
<br />1
<br />ea
<br />$600.00
<br />$600.00
<br />15
<br />Hydrospray seed, fertilizer, and mulch on water tank
<br />area
<br />1
<br />ac
<br />$850.00
<br />$850.00
<br />16
<br />Weed control for 2 years
<br />2
<br />yr
<br />$6,000.00
<br />$12,000.00
<br />Old Quarry Fines Disposal Area, Detail 3, Exh.
<br />C F
<br />1
<br />Haul large diam. rock from mine for channel, 4000'
<br />800 cy
<br />$2.25
<br />$1,800.00
<br />2
<br />Construct rock lined channel, 450',
<br />450 If
<br />$144.27
<br />$64,921.50
<br />See p. A-18 of Drainage Report, Exh. E
<br />Hydrospray seed, fertilizer, & mulch on sloped area,
<br />3
<br />1 acre
<br />1 ac
<br />$850.00
<br />$850.00
<br />Drill seed, fertilize, and straw mulch on open area, 2
<br />4
<br />acres
<br />2 ac
<br />$850.00
<br />$1,700.00
<br />5
<br />Weed control for two years
<br />2 yr
<br />$4,000.00
<br />$8,000.00
<br />Subtotal
<br />INDIRECT COSTS
<br />$206,075.60
<br />
|