My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-31_REVISION - M1977376 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977376
>
2015-07-31_REVISION - M1977376 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 2:11:17 PM
Creation date
8/4/2015 4:39:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977376
IBM Index Class Name
REVISION
Doc Date
7/31/2015
Doc Name
2nd Adequacy Review TR02
From
Gary Tuttle
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.11 EXHIBIT L- RECLAMATION COSTS <br />The reclamation work at the site will proceed concurrently with the mining. Therefore the costs to finish <br />reclamation at a point in time can vary. The costs for reclamation in this Exhibit are calculated for a <br />point in the operation where disturbed land is identified as maximum. That point is several years from <br />the commencement of mining (4 to 7 years) when: <br />• The Fines Disposal Area is seeded but not released. Reseeding may be necessary. <br />• The Mine Area has mining on the second bench (elev. 6135 at the north to elev. 6153 at the <br />south) and a substantial flat area of the bench is open. The post law disturbed area east of the <br />mine must be reclaimed. <br />• The Old Quarry Fines Disposal Area is undergoing filling and is half disturbed. <br />Acres in various stages of reclamation are: <br />• Fines Disposal Area 3 <br />• Mine Area 19 <br />• Old Quarry 3 <br />• Total 25 <br />The table on the following pages details the reclamation work items, provides quantities, and calculates <br />costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.