Laserfiche WebLink
It is important to note that no fill material will be placed in the river. All construction activities <br />will be consistent with the permit including best management practices. The downstream rock <br />vane in the river will be repaired using rocks that were disturbed during the spring runoff. A <br />few sod mats from the up -river islands previously used as a vegetation source area during the <br />initial construction phase will be extracted to repair the downstream toe -wood bench. <br />Thank you once again for your time and cooperation on this project. If you need further <br />information, please don't hesitate to contact me. <br />Respectfully, <br />Peter Kearl <br />Consulting Hydrologist <br />2263 Kingston Road I Grand Junction, CO 81507 1 (970) 985-9606 1 peter.kearl@hotmail.com <br />