My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-04_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2015-08-04_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:44 PM
Creation date
8/4/2015 12:50:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
8/4/2015
Doc Name
Adequacy Response
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
MR288
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TWENTYMILE COAL, LLC - FOIDEL CREEK MINE <br />MINOR REVISION MR15-288, 5MN PIPELINES <br />TECHNICAL ADEQUACY RESPONSES <br />Table of Contents <br />1. Revise TOC page iv to cite Exhibit 6T as being updated with MR288. <br />Response: The referenced page has been updated and accompanies these responses for replacement in <br />the PAP. <br />2. Update TOC to cite Exhibit 49CC as being updated with MR288. <br />Response: The referenced page does indicate that it was updated for MR288? <br />Permit Section 2.05 <br />3. Revised page 2.05-45.27 indicates the proposed updated water handling system is shown on <br />"Figure I ". The Division could not locate this figure. Please submit this document. Also please <br />revise page 45.27 to indicate where "Figure I " is located within the permit. <br />Response: Figure 1 was originally included in the project Scope -of -Work, which was provided for <br />reference in Exhibit 49CC. As a result of changes in project plans, the design illustrated by Figure 1 <br />was superceded and the revised design is shown by Figure EX49CC-F2. The noted text reference has <br />been revised to reflect this change and the revised page accompanies these responses for replacement <br />in the PAP. <br />4. Please cite that the design information for the 5MM Pipeline is located in Exhibit 49CC. <br />Response: Page 2.05-45.27 has been revised to reference the design information provided in Exhibit <br />49CC. <br />5. Revised page 2.05-84.9 cuts off the first paragraph of the currently approved page 2,05-84.9 <br />regarding soil handling and reclamation of the 19RT Mine Dewatering Borehole and Pipeline. Please <br />revise this page to include the cut off information. <br />Response: The referenced page has been reviewed and revised to include the missing text. Addition <br />of this text affects subsequent pages, so Pages 2.05-84.9 through 84.12 are revised and accompany <br />these responses for replacement in the PAP. <br />6. Revised page 2.05-84.10 does not include two paragraphs currently on the approved page <br />2.05-84.10 regarding the Loadout Area Drainage Modifications (MR] 4-284). Given this, text from the <br />subsequent pages has bumped in sequence. Please revise this page and/or subsequent pages to include <br />the missing information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.