Laserfiche WebLink
for backfilling in WHEX and Main Cresson in 2016 and 2017. A larger lift for <br />ECOSA will be presented in Amendment 11. <br />• Main Cresson (M-1980-244) Permit Amendment (Amendment No. 11), which will: <br />o Combine Permits M-1980-244 and M-1988-026; <br />o Modify mining practices to permit underground mining of ore and to authorize <br />underground production from the Chicago Tunnel and WHEX; <br />o Modify the permit boundary to include Stormwater Pond 9a, the Chicago Tunnel <br />portal area and a portion of Poverty Gulch; <br />o Reconcile the affected lands and permit boundary to match the permit boundary <br />as amended in 11. <br />o Modify backfill schedule for WHEX and Main Cresson mine areas; <br />o Modify mine plan and backfill plan for the Globe Hill and Schist Island mine <br />areas; <br />o Modify the ECOSA design to increase height to allow for additional over burden <br />storage; <br />o Modify reclamation plan to account for changes to backfill plans and ECOSA; <br />o Modify access issues and haul routes between the Chicago Tunnel and Cresson <br />property; and <br />o Address any potential modifications to the stacking plans for AGVLF and <br />SGVLF. <br />TRs will be filed in October — November 2015 and Amendment 11 will be submitted to DRMS <br />by December 31, 2015. <br />Please contact me at (719)-689-4048 or <chanks@anglogoldashanti.com> should you have <br />questions or wish to discuss the proposed permitting packages. CC&V would be happy to come <br />and meet with DRMS if that would be more convenient. <br />Sincere <br />Chris Hanks <br />Chief Environmental Coordinator <br />