Laserfiche WebLink
Mobilization Worksheet Cont'd <br />Task # 007 <br />Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />DENVER <br />Total one-way travel distance: <br />10.00 miles <br />Average Travel Speed: <br />45.00 mph <br />Total Non-Roadable Mob/Demob Cost <br />$4,945.88 <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />$0.00 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non- <br />Roadable Roadable <br />Equipment E ui ment <br />Haul Time (Hours): <br />0.22 0.22 <br />Return Time (Hours): <br />0.22 0.22 <br />Loading Time (Hours): <br />1.00 NA <br />Unloading Time (Hours): <br />1.00 NA <br />Subtotals: <br />2.44 0.44 <br />JOB TIME AND COST <br />Total job time: 4.89 Hours <br />Total job cost: $4,946 <br />CIRCES Cost Estimating Software <br />