My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-27_REVISION - M1980183
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980183
>
2015-07-27_REVISION - M1980183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:16:29 PM
Creation date
7/28/2015 11:08:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
REVISION
Doc Date
7/27/2015
Doc Name
Preliminary Adequacy Review AM02
From
DRMS
To
Brannan Sand & Gravel
Type & Sequence
AM2
Email Name
TOD
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Pit 29 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Mobilization/De mo bilization <br />PROJECT IDENTIFICATION <br />Permit Action: AM02 <br />Task #: 007 State: Colorado <br />Date: 7/27/2015 County: Adams <br />User: TOD <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Pagel of 2 <br />Permit/Job#: M1980183 <br />Abbreviation: None <br />Filename: M183-007 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br />TRAILER (25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0-25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: 1 <br />$88.67 <br />1 $117.55 1 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />60.66 <br />$72.57 <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr/uni <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />t <br />fleet <br />Cat D9T - 9U <br />60.66 <br />$72.57 <br />$125.45 <br />2 <br />$396.04 <br />$250.90 <br />$500.00 <br />Drill/Broadcast <br />25.00 <br />$39.59 <br />$88.67 <br />1 <br />$128.26 <br />$88.67 <br />$250.00 <br />Seeder with <br />Tractor <br />Power Mulcher <br />6.00 <br />$7.03 <br />$88.67 <br />1 <br />$95.70 <br />$88.67 <br />$250.00 <br />Reinco M90 <br />Subtotals: 1 $620.00 1 $428.24 1 $1,000.00 <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br />unit Costfhr/ fleet Cost/hr/ fleet <br />Subtotals: $0.00 $0.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.