My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-24_INSPECTION - C1980007
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980007
>
2015-07-24_INSPECTION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:21 PM
Creation date
7/27/2015 2:41:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
7/24/2015
Doc Name
Inspection Report
From
DRMS
To
Mountain Coal Company
Inspection Date
7/22/2015
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 22, 2015 C-1980-007/West Elk Mine JRS <br />spread on the pad and there was excellent vegetative cover. There were no weeds noted on the pad. <br />- Drill pad E3-32.5 was backfilled and regraded. The pad was stable and there were no signs of slumping, settling <br />or cracking. The pad blended well with the surrounding undisturbed areas and AOC has been achieved. There <br />was positive drainage off of the pad and no erosion was noted. The borehole was plugged but there was no <br />marker in place. A borehole marker will need to be installed prior to approval of SL -08. Topsoil has been <br />spread on the pad and there was excellent vegetative cover. There were no weeds noted on the pad. <br />- Drill pad E3-36 was backfilled and regraded. The pad was stable and there were no signs of slumping, settling or <br />cracking. The pad blended well with the surrounding undisturbed areas and AOC has been achieved. There was <br />positive drainage off of the pad and no erosion was noted. The borehole was plugged but there was no marker in <br />place. A borehole marker will need to be installed prior to approval of SL -08. Topsoil has been spread on the <br />pad and there was good vegetative cover. There were no weeds noted on the pad. <br />- Drill pad E3-40 was backfilled and regraded. The pad was stable and there were no signs of slumping, settling or <br />cracking. The pad blended well with the surrounding undisturbed areas and AOC has been achieved. There was <br />positive drainage off of the pad and no erosion was noted. Straw wattles have been placed half way up the slope <br />to help control erosion and runoff. The borehole was plugged but there was no marker in place. A borehole <br />marker will need to be installed prior to approval of SL -08. Topsoil has been spread on the pad and there was <br />good vegetative cover. There were no weeds noted on the pad. <br />- Drill pad E3-44 was backfilled and regraded. The pad was stable and there were no signs of slumping, settling or <br />cracking. The pad blended well with the surrounding undisturbed areas and AOC has been achieved. There was <br />positive drainage off of the pad and no erosion was noted. The borehole was plugged but there was no marker in <br />place. A borehole marker will need to be installed prior to approval of SL -08. Topsoil has been spread on the <br />pad and there was excellent vegetative cover. There were no weeds noted on the pad. <br />- Drill pad E3-47 was very wet and muddy from the recent rains. It was backfilled and regraded. The pad was <br />stable and there were no signs of slumping, settling or cracking. The pad blended well with the surrounding <br />undisturbed areas and AOC has been achieved. There was positive drainage off of the pad and no erosion was <br />noted. The borehole was plugged but there was no marker in place. A borehole marker will need to be <br />installed prior to approval of SL -08. There was a large amount of slash on the pad. The topsoil has been spread <br />on the pad and there was good vegetative cover. There were no weeds noted on the pad. <br />- Drill pad E3-55 was backfilled and regraded. The pad was stable and there were no signs of slumping, settling or <br />cracking. The pad blended well with the surrounding undisturbed areas and AOC has been achieved. There was <br />positive drainage off of the pad and no erosion was noted. There was slash and some straw wattles placed on the <br />steeper portions of the pad. The borehole was plugged but there was no marker in place. A borehole marker <br />will need to be installed prior to approval of SL -08. Topsoil has been spread on the pad and there was good <br />vegetative cover. There was a lot of Canada thistle on the pad that will need to be sprayed. <br />- Drill pad E3-59/61/63 was backfilled and regraded. The pad was stable and there were no signs of slumping, <br />settling or cracking. The pad blended well with the surrounding undisturbed areas and AOC has been achieved. <br />There was positive drainage off of the pad and no erosion was noted. There was a large amount of slash on the <br />pad. The three boreholes were plugged but there were no markers in place. Borehole markers will need to be <br />installed prior to approval of SL -08. Topsoil has been spread on the pad and there was good vegetative cover. <br />There were no weeds noted on the pad. <br />- Drill pad E3-64/65 was not backfilled or regraded. The pad is being left open for possible mine ventilation <br />boreholes for the future B -Seam mining. Only the borehole plugging and abandonment will be released in SL -08. <br />The boreholes were plugged and sealed and markers were in place. Topsoil has not been spread on the pad but the <br />pad was seeded for stability and erosion control until it is needed. There was good vegetative cover on the pad and <br />excellent vegetative cover on the topsoil pile. There were no weeds noted on the pad or the topsoil pile. <br />- Drill pad E3-68/72 was not backfilled or regraded. The pad is being left open for possible mine ventilation <br />boreholes for the future B -Seam mining. Only the borehole plugging and abandonment will be released in SL -08. <br />The boreholes were plugged and sealed and markers were in place. Topsoil has not been spread on the pad but the <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 3 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.