My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-23_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2015-07-23_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:20 PM
Creation date
7/27/2015 2:30:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
7/23/2015
Doc Name
Adequacy Review
From
DRMS
To
Jerry Nettleton
Type & Sequence
MR288
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Foidel Creek Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: MR288 <br />Task #: 000 State: Colorado <br />Date: 7/23/2015 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1982056 <br />Abbreviation: None <br />Filename: C056-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />Remove CMP Risers; 10'X 5 Risers <br />DEMOLISH <br />1 <br />1 <br />1 <br />1 <br />1 <br />0.00 <br />$2,012.09 <br />$1,580.70 <br />$60.00 <br />$277.00 <br />$1,661.00 <br />Cut-off and Cap 5MN Pipeline at 15 places <br />BOREHOLE <br />0.00 <br />Regrade Riser Area <br />GRADER <br />0.61 <br />Soil Replacement on riser area <br />DOZER <br />3.33 <br />Revegetation on 5MN pipeline and riser areas and <br />re -seed <br />REVEGE <br />4.60 <br />SUBTOTALS: <br />8.54 <br />$5,591 <br />INDIRECT COSTS <br />$112.94 <br />OVERHEAD AND PROFIT: <br />$58.71 <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />4.27 hrs <br />Profit: <br />10.00% <br />Total = <br />$112.94 <br />Total = <br />$58.71 <br />Total = <br />$320.93 <br />Total = <br />$559.10 <br />TOTAL O & P = <br />$1,051.68 <br />CONTRACT AMOUNT (direct + O & P) = <br />$6,642.68 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />4.25% <br />Total = $282.31 <br />Reclamation management and/or administration: <br />5.00% <br />$332.13 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $1,666.13 <br />TOTAL BOND AMOUNT (direct + indirect) = $7,257.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.