My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-23_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2015-07-23_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:20 PM
Creation date
7/27/2015 2:30:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
7/23/2015
Doc Name
Adequacy Review
From
DRMS
To
Jerry Nettleton
Type & Sequence
MR288
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jerry Nettleton <br />Page 2 <br />July 23, 2015 <br />Exhibit 49CC <br />7. The coversheet for Exhibit 49CC reads "Exhibit 4CC". Please revise the cover page for this <br />Exhibit to read Exhibit 49CC. Please note that the Division intends to insert the 5MN Pipeline <br />design information after the 5MN pad and access road diagram. <br />8. Twentymile Coal (TC) submitted design information for the 5MN pipeline as an addition to <br />Exhibit 49CC. This information contains a "scope of work" document that appears to be the <br />document TC used to announce the project for contractor bids. The "scope of work" narrative <br />does not seem to match the installation of the pipeline discussed in revised sections 2.05 and <br />depicted on revised map 924 (Sheet 2). The "scope of work" indicates only 1,700 feet of pipeline <br />will be installed along with two access culvert risers and associated valves. Revised section 2.05 <br />indicated 5,000 feet of pipeline will be installed along with five culvert risers and associated <br />valves. However, one map contained in revised Exhibit 49CC titled "Figure EX49CC — F2, 6MN <br />Pipelines" does depict the pipeline installation as shown on revised map 924. This may lead to <br />some confusion. Please either revise this exhibit to match the pipeline project discussed in <br />section 2.05 in the permit and depicted on revised map 924 or provide a narrative in section 2.05 <br />that indicates why the scope of work text in Exhibit 49CC is different than the project description. <br />This concludes the Division's review of MR288. Enclosed is a copy of the reclamation cost estimate <br />conducted for this revision. The Division must issue its proposed decision by August 1St, 2015. If you <br />need additional time to address the adequacy review issues please request an extension of the decision <br />date. If you have any questions feel free to contact me at (303) 866-3567, extension 8120. <br />Sincerely, <br />�c6jj--,�— <br />Jared Ebert <br />Environmental Protection Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.