Laserfiche WebLink
PERMIT #: M-2002-020 <br />INSPECTOR'S INITIALS: PSH <br />INSPECTION DATE: July 17, 2015 <br />of water required to cover the pump should have a minimal affect on the effective capacity of the tank. <br />Wells #1 and #2 <br />As part of the corrective actions for the problem cited on the first page, the City will verify flow rate of Well #1 <br />with the goal of reducing the pumping rate to a sustainable rate. <br />The Division requests Mr. Rodman allows the City of Greeley to restart the quarterly groundwater monitoring <br />measurements for Well #1 and Well #2. The groundwater monitoring data will allow the City and Division to <br />see potential impacts to Well #2 before the well is not able to provide adequate water for domestic use. The <br />City agreed to provide groundwater well log information to Mr. Rodman for his records if monitoring resumes. <br />Photographs taken during the inspection are attached. <br />Page 3 of 6 <br />