Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. I <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />1) Field Activities: <br />The following activities were observed: Placement and compaction of the Phase 1 & 2 Structural Fill <br />materials; placement, compaction, density testing and depth verification of Soil Liner Fill materials; pump <br />monitoring at the LVSCS riser pipes; subgrade acceptance; soil liner fill acceptance; geomembrane <br />installation and acceptance; and remediation of underground workings. <br />II) Laboratory Activities: <br />Concrete testing, atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. <br />The following samples were collected: Cameron— Soil Liner Fill; SLF-186-C <br />General Project Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held July 8, 2015 (Amec Foster Wheeler, CC&V, Ames). Amec <br />Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br />Contractor Meeting. <br />r Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler. and Ames. <br />Deliveries: None. <br />CQA Monitor <br />Submitted by: Date: July 15, 2015 <br />Bobby Redd, EI <br />Project Resident <br />Reviewed by: Date: <br />CC&V Projects <br />Reviewed By: -�_ Date: 7�1 7 <br />Reviewed By: Date: <br />