CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125NO <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: June 20, 2015 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 6.14.2015 through 6.20.2015 <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 69°F to 78°F Cloud Cover: Cloudy to Mostly Cloudy <br />Lows: 44°F to 54°F Precipitation: Rain <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF) <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Note: An Amec Foster Wheeler field professional monitored fill material temperatures during fill <br />placement; average structural fill temperatures were above 32°F. All construction materials <br />placed were verified as suitable, and construction methods were in accordance with project <br />technical specifications. <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />Cat dozers graded the slope in the vicinity of stations 114+00 to 118+00, HM16+00 to HM20+00, <br />JM8+00 to JM12+00 and HHO+00 to HH2+00. <br />CC&V hauled material to the Dump 4 surge in Phase 2 using Cat 793 haul trucks. A Cat dozer <br />placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum roller <br />compacted the fill area. <br />A Cat D10 dozer and a Cat smooth drum roller placed and compacted Structural Fill to grade per <br />project plans and specifications in the vicinity of UG #6050. <br />Cat excavators removed structural fill material on the ramp in the north corner of the PSSA above <br />station A22+00. The material was hauled by 740 haul trucks and placed between stations <br />C16+00 to C18+00. A Cat smooth drum roller was used to compact the material per project <br />Days <br />S <br />I M <br />I T <br />I W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />D=Day Shift N=Night Shift W= Weather <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 69°F to 78°F Cloud Cover: Cloudy to Mostly Cloudy <br />Lows: 44°F to 54°F Precipitation: Rain <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF) <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Note: An Amec Foster Wheeler field professional monitored fill material temperatures during fill <br />placement; average structural fill temperatures were above 32°F. All construction materials <br />placed were verified as suitable, and construction methods were in accordance with project <br />technical specifications. <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />Cat dozers graded the slope in the vicinity of stations 114+00 to 118+00, HM16+00 to HM20+00, <br />JM8+00 to JM12+00 and HHO+00 to HH2+00. <br />CC&V hauled material to the Dump 4 surge in Phase 2 using Cat 793 haul trucks. A Cat dozer <br />placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum roller <br />compacted the fill area. <br />A Cat D10 dozer and a Cat smooth drum roller placed and compacted Structural Fill to grade per <br />project plans and specifications in the vicinity of UG #6050. <br />Cat excavators removed structural fill material on the ramp in the north corner of the PSSA above <br />station A22+00. The material was hauled by 740 haul trucks and placed between stations <br />C16+00 to C18+00. A Cat smooth drum roller was used to compact the material per project <br />