My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-17_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-07-17_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:13 PM
Creation date
7/20/2015 8:31:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/17/2015
Doc Name
Weekly CQA Report - weeks ending 6/20/2015 and 6/27/2015
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />All of the above Structural Fill material was placed, compacted, and graded per the project plans <br />and specifications. <br />Subgrade: <br />See attached figure for approved subgrade. <br />Soil Liner Fill: <br />Cat dozers were used to cut SLF to final grade between stations A14+50 to A22+00 and C12+00 <br />to C16+00 and to the ADR Haul Road. <br />A Cat skidsteer, a Cat smooth drum roller, and a water truck equipped with a firehose were used <br />for final preparation of the SLF material prior to liner deployment. <br />A Cat dozer cut SLF to rough grade between stations DD4+00 to DD14+ 00. <br />Cat 777 haul trucks hauled SLF from the Cameron SLF stockpile to the Phase 1 stockpile. A <br />John Deere excavator loaded 740 haul trucks from Phase 1 SLF stockpile and placed the <br />material between the C and E bench approximate stations C16+00 to E12+00. <br />All of the above Soil Liner Fill material was placed, compacted, and graded per the project plans <br />and specifications. Moisture content, density testing and depth verification was performed prior to <br />surface acceptance and geomembrane installation. <br />See attached figure for approved SLF. <br />Drain Cover Fill: <br />Cat 740 haul trucks transported DCF from the stockpile to Phase 1. Low ground pressure Cat <br />dozers placed DCF on approved geomembrane in Phase 1. <br />See attached figure for approved DCF. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: None. <br />Tertiary Underdrain: None. <br />Leak Detection: <br />None. <br />Miscellaneous: <br />Amec personnel continued LVSCS pump monitoring and observation. <br />B) Underground Workings: <br />UG #6004: Cat excavators prepared additional drill access. Further remediation required. <br />UG #6455: Continued drilling operations, 4,150LF. Further remediation required. <br />UG #6456: Continued drilling operations, 3001-F. Further remediation required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.