CRIPPLE CREEK & VICTOR GOLD MINING Co. I <br />I, <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125N0 <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: June 27, 2015 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 6.21.2015 through 6.27.2015 <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 71°F to 80°F Cloud Cover: Cloudy to Mostly Cloudy <br />Lows: 48°F to 53°F Precipitation: Rain <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />A Cat dozer graded the Structural Fill material between stations A20+00 to A22+00 where the <br />PSSA access ramp was removed. A Cat smooth drum roller compacted the subgrade. <br />A Cat dozer removed a portion of the slope near station F4+00 at an approximate elevation of <br />9,760 feet. The dozer stockpiled the material for removal. A Cat front end loader loaded 740 haul <br />trucks with the Structural Fill material and it was hauled to a fill location near station C16+00. The <br />material was placed with a Cat dozer and compacted with a Cat smooth drum roller. <br />A Cat dozer finished subgrade on the slope in preparation for soil liner fill material between <br />stations C16+00 and C17+00 along ADR2 Haul Road. A Cat dozerfinished subgrade between <br />stations FM8+00 to FM12+00 and J12+00 and J14+00. Two Cat dozers graded the slope <br />between stations 114+00 to 118+00, L8+00 to L10+00, DDO+00 to DMO+00, HM10+00 to <br />HM20+00, HHO+00 to HH2+00, and FM8+00 to FM12+00. <br />CC&V hauled material to the Dump 4 surge in Phase 2 using Cat 793 haul trucks. A Cat dozer <br />placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum roller <br />compacted the fill area. <br />Days <br />S <br />I M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />D <br />D=Day Shift N=Night Shift W= Weather <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 71°F to 80°F Cloud Cover: Cloudy to Mostly Cloudy <br />Lows: 48°F to 53°F Precipitation: Rain <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />A Cat dozer graded the Structural Fill material between stations A20+00 to A22+00 where the <br />PSSA access ramp was removed. A Cat smooth drum roller compacted the subgrade. <br />A Cat dozer removed a portion of the slope near station F4+00 at an approximate elevation of <br />9,760 feet. The dozer stockpiled the material for removal. A Cat front end loader loaded 740 haul <br />trucks with the Structural Fill material and it was hauled to a fill location near station C16+00. The <br />material was placed with a Cat dozer and compacted with a Cat smooth drum roller. <br />A Cat dozer finished subgrade on the slope in preparation for soil liner fill material between <br />stations C16+00 and C17+00 along ADR2 Haul Road. A Cat dozerfinished subgrade between <br />stations FM8+00 to FM12+00 and J12+00 and J14+00. Two Cat dozers graded the slope <br />between stations 114+00 to 118+00, L8+00 to L10+00, DDO+00 to DMO+00, HM10+00 to <br />HM20+00, HHO+00 to HH2+00, and FM8+00 to FM12+00. <br />CC&V hauled material to the Dump 4 surge in Phase 2 using Cat 793 haul trucks. A Cat dozer <br />placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum roller <br />compacted the fill area. <br />