Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />June 2015 Monthly Report <br />Page 2 <br />Table 1 -June 2015 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitoring Site <br />Date <br />Depth to Water (feet) <br />M -4R <br />6/30/15 <br />0 <br />M-6 <br />6/30/15 <br />Dry <br />M-7 <br />6/30/15 <br />Dry <br />M-8 <br />6/30/15 <br />Dry <br />M-9 <br />6/30/15 <br />141.69 <br />M-10 <br />6/30/15 <br />24.71 <br />M-11 R <br />6/30/15 <br />40.45 <br />M-12 <br />6/30/15 <br />175.52 <br />M -13R <br />6/30/15 <br />126.62 <br />M-14 <br />6/30/15 <br />131.67 <br />M-15 <br />6/30/15 <br />91.35 <br />M-16 <br />6/30/15 <br />20.29 <br />M-19 <br />6/30/15 <br />24.47 <br />M-21 <br />6/30/15 <br />18.23 <br />M-22 <br />6/30/15 <br />16.51 <br />M-26 <br />6/30/15 <br />16.44 <br />M-32 <br />6/30/15 <br />49.58 <br />M-33 <br />6/30/15 <br />46.23 <br />M-34 <br />6/30/15 <br />23.77 <br />BF -4 <br />6/30/15 <br />24.88 <br />BF -6 <br />6/30/15 <br />30.81 <br />LS -IR <br />6/30/15 <br />Dry <br />LS -2R <br />6/30/15 <br />Dry <br />LS -3 <br />6/30/15 <br />Dry <br />LD -IR <br />6/30/15 <br />Dry <br />LD -2R <br />6/30/15 <br />Dry <br />LD -3 <br />6/30/15 <br />Dry <br />Table 2 — June 2015 Tailing Disposal Area Piezometer Depth to Water <br />Piezometer Date Depth to Water Total Depth (ft) Volume of <br />(feet) Water (ft) <br />P6 <br />6/30/15 <br />Dry <br />72.46 <br />0.00 <br />P7 <br />6/30/15 <br />92.30 <br />92.50 <br />0.20 <br />P8 <br />6/30/15 <br />96.98 <br />97.51 <br />0.53 <br />P9 <br />6/30/15 <br />71.91 <br />72.30 <br />0.39 <br />