My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-14_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2015-07-14_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:07 PM
Creation date
7/15/2015 4:54:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
7/14/2015
Doc Name
Activities Report - June 2015
From
Battle Mountain
To
DRMS
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 7, 2015 <br />BATTLE MOUNTAIN RESOURCES, INC. <br />Mr. Wally Erickson <br />State of Colorado <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No,M-88-112 <br />June 2015 Monthly Report <br />Dear Mr. Erickson: <br />NOF RC Sp�� <br />QO\MO\\NG pg�� <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRI), <br />San Luis Project for the month of June, 2015. <br />Surface and ground water monitoring and analysis were completed for all required sites during the month <br />per the terms and conditions of the TR -32 Quality Assurance and Quality Control (QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on June 30`h, no water was present for sampling and <br />subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br />Pit monitoring wells on June 306'. June tailing impoundment piezometer measurements identified these <br />installations were either dry or contained less than 12 inches of water as illustrated in Table 2. Tables 1 <br />and 2 below identify the depth to water measurements collected for each of the site monitoring wells, <br />piezometers and lysimeters as required by the terms and conditions of the TR -32 QA/QC plan. <br />The leak detection system was measured on June 306i. A total of 910 gallons of water was excavated from <br />the leak detection system yielding a monthly average of 26.7 gpad. The tailings pond under -drain <br />measured 42 gpm. <br />During the month of June, the West Pit water treatment plant operated efficiently discharging a total of <br />8,858,300 gallons (27.19 acre-feet) of water to Rito Seco Creek and a total of 1,176,000 gallons (3.61 <br />acre-feet) of water was transferred from the West Pit to the tailings impoundment. Seepage along Rito <br />Seco Creek remained dry during the month. <br />P.O. Box 310 • San Luis, Colorado 81152-0310 • (719) 379-0798 • Fax (719) 379-0713 L/yd <br />
The URL can be used to link to this page
Your browser does not support the video tag.