Laserfiche WebLink
Flows from a 100 -year, 24-hour storm event (Rule 4.10.3(2)), or 10 - <br />year, 24-hour storm event (Rule 4.05.3(3)) <br />Underdrain System As required by Rule 4.10.3(1) <br />Sediment Pond PHC for Pond "D" shown in Volume III, Appendix 8 <br />Contain the 10 -year, 24-hour storm and the associated sediment, <br />provide a non -clogging dewatering device, and an <br />emergency spillway system (Rule 4.056(3,4)) <br />Overflow Spillway System Pond "D" Spillway detail shown in Volume III, Appendix 8 <br />A single overflow spillway able to transport flows from a 25- year, <br />24-hour storm event (Rule 4.05.6(5)) <br />Reclamation Salvage and reclamation volumes of topsoil and coverfill material <br />for Gob Pile #1 are located in Appendix A, Volume IX <br />Stockpiling stripped topsoil, overburden, and haul road cut material <br />in the area of the proposed coal mine waste bank, covering re- <br />contoured waste with a minimum of 4 feet of cover and topsoil, then <br />revegetating (Rule 4.10.4(5)) <br />TR -97 5i 11/14 <br />