Laserfiche WebLink
Table 5 <br />Martin Marietta <br />Upper Poudre Combined Sites <br />2015 Water Balance <br />Lagged Depletions Replacements <br />Month <br />North Taft Hill <br />Lagged <br />Depletions <br />(acre-feet) <br />A <br />Home Office <br />Lagged <br />Depletions <br />(acre-feet) <br />B <br />Overland Ponds <br />Lagged <br />Depletions <br />(acre-feet) <br />C <br />Total Lagged <br />Depletions <br />Requiring <br />Replacement <br />(ac -ft) <br />(D) <br />Recharge Credit <br />to River <br />(acre-feet) <br />E <br />Taylor and Gill Return Flow <br />Deliveries Sent Requirement for <br />Directly to Deliveries Sent <br />River Directly to <br />(acre-feet) (acre-feet) <br />F G <br />Net Ditch Credit <br />Directly to <br />River <br />(acre-feet) <br />H <br />Net Impact to <br />Poudre River <br />(acre-feet) <br />I <br />Jan -15 <br />-0.26 <br />-1.81 <br />-1.66 <br />-3.74 <br />6.91 <br />0.00 0.23 <br />-0.23 <br />2.95 <br />Feb -15 <br />-0.10 <br />-1.49 <br />-1.41 <br />-2.99 <br />5.66 <br />0.00 0.19 <br />-0.19 <br />2.48 <br />Mar -15 <br />-0.16 <br />-2.49 <br />-1.45 <br />-4.09 <br />4.66 <br />0.00 0.15 <br />-0.15 <br />0.41 <br />Apr- 15 <br />-0.33 <br />-4.68 <br />-1.65 <br />-6.66 <br />4.18 <br />6.73 3.62 <br />3.11 <br />0.63 <br />May- 15 <br />-1.20 <br />-5.92 <br />-1.24 <br />-8.36 <br />-11.92 <br />61.25 38.53 <br />22.72 <br />2.45 <br />Jun -15 <br />-2.19 <br />-8.25 <br />-0.55 <br />-11.00 <br />-4.02 <br />43.24 16.40 <br />26.84 <br />11.82 <br />Jul -15 <br />-2.74 <br />-8.94 <br />-0.22 <br />-11.90 <br />8:98 <br />49.99 20.35 <br />29.65 <br />26.72 <br />Aug- 15 <br />-2.95 <br />-8.55 <br />-0.09 <br />-11.60 <br />15.06 <br />32.00 13.73 <br />18.27 <br />21.72 <br />Sep -15 <br />-2.89 <br />-6.94 <br />-0.04 <br />-9.87 <br />19.24 <br />0.00 0.00 <br />0.00 <br />9.37 <br />Oct -15 <br />-2.68 <br />-5.46 <br />-0.02 <br />-8.15 <br />43.81 <br />0.00 0.09 <br />-0.09 <br />35.57 <br />Nov -15 <br />-2.41 <br />-4.45 <br />-0.01 <br />-6.87 <br />26.27 <br />0.00 1.45 <br />-1.45 <br />17.96 <br />Dec -15 <br />-1.93 <br />-2.58 <br />0.00 <br />-4.52 <br />19:20 <br />0.00 0.99 <br />-0.99 <br />13.69 <br />Total <br />-19.83 <br />-61.57 <br />-8.33 <br />-89.74 <br />138.02 <br />193.21 95.71 <br />97.51 <br />145.79 <br />Notes: <br />(A) Total lagged depletions calculated in Table 1. <br />(B) Total lagged depletions calculated in Table 2. <br />(C) Total lagged depletions calculated in Table 3. <br />(D) Equals (A) + (B) + (C) multiplied by percent of the month a call existed downstream. <br />(E) Total recharge credit calculated in Table 4. <br />(F) Estimated deliveries of Taylor and Gill water directly to the Cache la Poudre River based on Taylor and Gill historical average farm headgate deliveries. <br />(G)Retum flow requirements associated with Taylor and Gill water being sent directly to the river. Winter return flow requirements are subtracted from recharge credits. <br />(H) Total credit to the river based on deliveries of Taylor and Gill water made directly to the river. Equals (F) - (G). <br />(I) Equals (D) + (E) + (H). <br />BBA <br />