Laserfiche WebLink
Table 4 <br />Martin Marietta <br />Upper Poudre Combined Sites <br />Recharge Ponds Accretions <br />2014 Deliveries = 141.58 acre-feet <br />Month <br />Taylor & Gill <br />FHG Deliveries <br />(acre-feet) <br />(A) <br />Estimated <br />Recharge Ponds <br />Evaporation <br />(acre-feet) <br />(B) <br />Net <br />Recharge <br />(acre-feet) <br />C) <br />Lagged Recharge <br />Credit Accretion <br />(acre-feet) <br />(D) <br />Return <br />Flow <br />Factor <br />(%) <br />E) <br />Return Flow <br />Obligations <br />(acre-feet) <br />F) <br />Net Recharge <br />Accretion <br />(acre-feet) <br />G) <br />Jan -15 <br />0.00 <br />0.00 <br />7.49 <br />0.41% <br />0.58 <br />6.91 <br />Feb -15 <br />0.00 <br />0.00 <br />6.14 <br />0.34% <br />0.48 <br />5.66 <br />Mar -15 <br />0.00 <br />0.00 <br />5.05 <br />0.28% <br />0.39 <br />4.66 <br />Apr- 15 <br />0.00 <br />0.00 <br />0.00 <br />4.18 <br />53.72% <br />0.00 <br />4.18 <br />15 <br />34.48 <br />1.14 <br />33.34 <br />9.77 <br />62.90% <br />21.69 <br />-11.92 <br />-May- <br />Jun -15 <br />80.00 <br />1.38 <br />78.62 <br />26.32 <br />37.92% <br />30.34 <br />-4.02 <br />Jul -15 <br />80.00 <br />1.43 <br />78.58 <br />41.54 <br />40.70% <br />32.56 <br />8.98 <br />Aug- 15 <br />80.00 <br />1.28 <br />78.72 <br />49.39 <br />42.92% <br />34.33 <br />15.06 <br />Sep- 15 <br />72.10 <br />0.95 <br />71.15 <br />53.28 <br />47.22% <br />34.05 <br />19.24 <br />Oct -15 <br />10.83 <br />0.67 <br />10.17 <br />43.97 <br />0.04% <br />0.16 <br />43.81 <br />Nov -15 <br />0.00 <br />0.00 <br />28.95 <br />0.75% <br />2.67 <br />26.27 <br />Dec -15 <br />0.00 <br />0.00 <br />21.04 <br />0.51% <br />1.84 <br />19.20 <br />Total <br />357.42 <br />6.84 <br />350.58 <br />297.10 <br />- <br />159.09 <br />138.02 <br />Notes: <br />(A) Total average farm headgate deliveries to the recharge ponds based on HCU for portion of Taylor and Gill Ditch water sent to the <br />recharge ponds. <br />(B) Evaporation estimated based on total recharge pond surface area when diversions are being made. Surface area of recharge ponds <br />are expected to be 3 acres during the 2015 irrigation season. <br />(C) Equals (A) - (B) <br />(D) Lagging calculations were based on the following parameters: <br />Distance from stream = 2,300 ft, Transmissivity = 160,000 gpd/ft, Specific Yield = 0.2, No -flow Boundary = 6,500 ft <br />(E) Return flow factors are based on HCU analysis for the 5.75 shares of Taylor and Gill Ditch Water. <br />(F) January -March = (2012 Deliveries * (E) ), April -September = (B)*(E), October -December = (2013 Deliveries * (E)). <br />(G) Equals (D) - (F) <br />BBA <br />