My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-09_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2015-07-09_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:04 PM
Creation date
7/9/2015 9:19:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
7/9/2015
Doc Name
Adequacy Letter
From
DRMS
To
Tri-State Generation and Transmission Assoc
Type & Sequence
PR4
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chris Gilbreath <br />Page 3 <br />Exhibit 7-23, Part C <br />ITEM 16. For four of the ponds in Table 1, the peak discharge is the same for primary and emergency <br />spillways. Please address this apparent error. <br />ITEM 17. In Table 1 emergency spillway lengths appear incorrect for some ponds. On drawings they <br />look longer than 20 feet. Please address this apparent error. <br />ITEM 18. Scales on some figures are incorrect (e.g., Fig C-3 in Exhibit 7-23). Please check these and <br />correct as necessary. <br />ITEM 19. On page Exh. 7-23C-1, in the third paragraph, the term "Practice Factor" is used. It appears <br />that this should be "Cover Factor" instead. Please address this apparent error. <br />ITEM 20. Please explain the origin of the L (most are 145 feet) and S (most are 31 %) input values. <br />ITEM 21. In particle size distribution there is a discrepancy ingrain size curve: is 33% less than 0.040 <br />mm or 0.004 mm? There maybe a typo on page 7 in Exhibit 7 (revised with TR -95). Please address this <br />apparent error. <br />ITEM 22. In design specs, "borrow" sources should replace "sorrow" sources. <br />ITEM 23. Please address the following apparent errors and questions related to the Sidehill Pond design. <br />• There is no primary spillway on plan view. <br />• Is the pink line the location of the 18" CMP? <br />• The spillway pipe slope is unclear. In SEDCAD it is 4%, drawing says 2.1%, and elevations (on <br />drawing there is 1.9' drop over 125') indicate 1.5%. (Please check for all ponds.) <br />• There is no spec for materials of riser pipe (same for other ponds). <br />• Is the height of the riser pipe incorrect in Table 1 and in SEDCAD run? The value of 13 feet <br />contradicts the drawing; it looks like it should be 5.5 feet. (Possibly switched with Section 26 <br />Pond.) <br />ITEM 24. Regarding the Section 26 Pond, is the height of riser pipe incorrect in Table 1 and in <br />SEDCAD run? It is 13 feet on the drawing. Please address this apparent error. <br />ITEM25. The term "Sec 36 Middle Pond" in SEDCAD is confusing. Should it be "Middle Pond"`? <br />Please revise if SEDCAD is re -run. <br />ITEM 26. Regarding the Section 36 Pond, the barrel diameter is 24" in Table 1 but 18" on drawing. <br />Please address this apparent error. <br />ITEM 27. Regarding the Middle Pond bottom elevation, the drawing and Table 1 are not in agreement. <br />Please address this apparent error. <br />
The URL can be used to link to this page
Your browser does not support the video tag.