Laserfiche WebLink
h) There will be direct access from the pit onto the existing trail road or the county road. <br />No new roads will be required. <br />i) No water is anticipated in conjunction with the operation. There could be instances <br />when heavy rainfall makes the site too muddy to continue. At those times, mining will <br />simply cease until the site becomes dry enough to mine again. <br />j) Mining will not go into the groundwater at the site. <br />k) Since no water is to be used, there should be no injury to existing water rights. <br />1) No refuse, acid, or toxic producing materials are anticipated at the site. Other mining <br />enterprises in this part of Phillips County have never yielded any such materials. <br />m) The finished pit will be returned to wildlife habitat in the area outside the creek. No <br />seeding is anticipated in the creek flow area. There should be no disturbance to the <br />hydrologic balance. <br />n) There is no processing of the material anticipated at the site. <br />o) The commodities to be mined are gravel, clay, and sand. <br />p) The mined materials will primarily be used for road operations. <br />q) No explosives will be used in this operation. <br />Phillips County Landfill Page 4 <br />