Laserfiche WebLink
Carper Pit #2 Calculation Notes <br />Calclulations are based on work to 42.7 acres. <br />Backfillina and gradin <br />6,550 ft. Perimeter involved x <br />163,750 sq.ft. x <br />163,750 cu.ft. / <br />42.7 Ac. x <br />1,696,262 cu.ft. <br />25 ft. (slope distance) = <br />1 ft. (depth to grade) = <br />27 cu.ft. _ <br />43,560 sq.ft. Area in Acre = <br />Area previously calculated + <br />Depth to grade x <br />/ 27 cu.ft. <br />Total Cubic Yards to move <br />Dozer will move 795 CY/Hour <br />68,889 CY / <br />Replace Topsoil <br />0.5 ft. (inches of. topsoil) x <br />0.5 (inches of. topsoil) <br />81,875 cu.ft. / <br />711,450 cu.ft. / <br />Speedy Mover will move 117 CY/Hour <br />29,382 CY / <br />795 CY/hour <br />163,750 = <br />(Slope only) <br />1,422,900 = <br />(Floor) <br />27 cu.ft. _ <br />27 cu.ft. _ <br />117 CY/Hour = <br />163,750 sq.ft. <br />163,750 cu.ft. <br />6,065 CY <br />1,860,012 sq.ft. <br />163.750 sq.ft. <br />1,696,262 sq.ft. <br />1 ft. <br />1,696,262 cu.ft. <br />62,825 CY <br />6.065 CY <br />68,889 CY <br />86.7 Hrs. <br />81,875 cu.ft. <br />711,450 <br />3,032 CY <br />26,350 CY <br />29,382 CY <br />251.1 Hrs. <br />