Laserfiche WebLink
EXHIBIT L - Reclamation Costs <br />The converted Carper Pit #2 will have a total of 42.7 acres. As a new tract is opened, <br />reclamation will begin on the last tract mined. <br />1) The area of excavation will be mined as close to a slope of 3:1 as possible and finished at <br />3:1. <br />2) All topsoil will be re-applied to the excavations. <br />3) The slopes will be prepared and seeded as recommended by the Natural Resource <br />Conservation Service. <br />4) An estimate of reclamation costs is attached. <br />