Laserfiche WebLink
Mr. Langenfeld <br />Page 2 <br />July 7, 2015 <br />5. The proposed drilling will take place on two drill pads. Please provide a brief description of <br />how the drill pads will be constructed. Will the pads be raised above the existing elevation or <br />will the pad location simply be cleared of topsoil and leveled? <br />Be advised that if these items have not been addressed within 60 days of the date of this letter <br />(September 5, 2015), the Division may terminate the NOI application in accordance with Rule <br />5.1.3(c) of the Hard Rock Rules. Please remember to designate as appropriate those materials in <br />the application that you desire to be made confidential versus those to be made public. <br />If you have any questions, you may contact me at (303)866-3567 x8116. <br />Sincerely, <br />Michael A. Cun ngham <br />Environmental Protection Specialist <br />CC: Wally Erickson, DRMS <br />Michael Pfister, Golden Cross Aggregates <br />