Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec .l <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />1) Field Activities: <br />The following activities were observed: Placement and compaction of the Phase 1 & 2 Structural Fill <br />materials, placement, compaction, density testing and depth verification of Soil Liner Fill materials, pump <br />monitoring at the LVSCS riser pipes, tertiary underdrain construction, soil liner fill acceptance, <br />geomembrane installation and acceptance, and remediation of underground workings. <br />II) Laboratory Activities: <br />Concrete testing, atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. <br />The following samples were collected <br />General Proiect Items <br />Meetings and Discussions: <br />Phase 1 — Drain Cover Fill; 1 -DCF -2-R <br />Phase 1 — Soil Liner Fill; 1-SLF-10-R <br />Phase 1 — Soil Liner Fill; 1-SLF-11-R <br />The Weekly Contractor Meeting was held June 10, 2015 (Amec Foster Wheeler, CC&V, Ames). Amec <br />Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br />Contractor Meeting. <br />Ames daily safety meetings <br />5% Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler. and Ames. <br />Deliveries: None. <br />CQA Monitor <br />Submitted by: <br />Bobby Redd, EI <br />Project Resident <br />Reviewed by:� <br />CC&V Projects <br />Reviewed B i <br />Date: June 16, 2015 <br />Date: G /? z /2415 <br />Date: &12-1 /if, <br />Reviewed By: Date: <br />