My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-30_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-06-30_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:47 PM
Creation date
7/7/2015 9:38:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/30/2015
Doc Name
Weekly CQA Report - week ending 6/13/2015
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec .l <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />1) Field Activities: <br />The following activities were observed: Placement and compaction of the Phase 1 & 2 Structural Fill <br />materials, placement, compaction, density testing and depth verification of Soil Liner Fill materials, pump <br />monitoring at the LVSCS riser pipes, tertiary underdrain construction, soil liner fill acceptance, <br />geomembrane installation and acceptance, and remediation of underground workings. <br />II) Laboratory Activities: <br />Concrete testing, atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. <br />The following samples were collected <br />General Proiect Items <br />Meetings and Discussions: <br />Phase 1 — Drain Cover Fill; 1 -DCF -2-R <br />Phase 1 — Soil Liner Fill; 1-SLF-10-R <br />Phase 1 — Soil Liner Fill; 1-SLF-11-R <br />The Weekly Contractor Meeting was held June 10, 2015 (Amec Foster Wheeler, CC&V, Ames). Amec <br />Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br />Contractor Meeting. <br />Ames daily safety meetings <br />5% Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler. and Ames. <br />Deliveries: None. <br />CQA Monitor <br />Submitted by: <br />Bobby Redd, EI <br />Project Resident <br />Reviewed by:� <br />CC&V Projects <br />Reviewed B i <br />Date: June 16, 2015 <br />Date: G /? z /2415 <br />Date: &12-1 /if, <br />Reviewed By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.