Laserfiche WebLink
BULLDOZER WORK <br />Task description: Z Dip Pit Regrade (Spoil Side) <br />Site: Trapper Mine Permit Action: MT7 Permit/Job#: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: 010 <br />Date: 6/12/2015 <br />User: JLE <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DI IR - 11 SU <br />Horsepower: <br />850 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />3 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C081-010 <br />Total unit Cost/Hour: $437.09 <br />Total Fleet Cost/Hour: $1,311.26 <br />MATERIAL QUANTITIES <br />Initial Volume: 625,898 <br />Swell factor: 1.000 <br />Loose volume: 625,898 LCY <br />Source of estimated volume: Permit Appendix A, Table 1.4-3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />455 feet <br />671.1 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-10% <br />7,000 feet <br />2,4751bs/LCY <br />User Provided <br />Job Condition Correction Factor <br />Utilization % <br />Ownership Cost/Hour: <br />$90.05 <br />NA <br />Operating Cost/Hour: <br />$308.78 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.26 <br />NA <br />Total unit Cost/Hour: $437.09 <br />Total Fleet Cost/Hour: $1,311.26 <br />MATERIAL QUANTITIES <br />Initial Volume: 625,898 <br />Swell factor: 1.000 <br />Loose volume: 625,898 LCY <br />Source of estimated volume: Permit Appendix A, Table 1.4-3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />455 feet <br />671.1 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-10% <br />7,000 feet <br />2,4751bs/LCY <br />User Provided <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />(AVG. <br />Material consistency: <br />1.000 <br />CAT HB <br />Dozing method: <br />1.200 <br />S -BY -S <br />Visibility: <br />1.000 <br />AVG. <br />Job efficiency: <br />0.790 <br />(3 SHIFTS/DAY) <br />