Laserfiche WebLink
Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 0.8091 <br />1.000 <br />1.225 <br />1.000 <br />0.929 <br />1.000 <br />Adjusted unit production: 542.99 LCY/hr <br />Adjusted fleet production: 1628.97 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 3 Dozer(s) <br />Unit cost: $0.805/LCY <br />Total job time: 126.47 Hours <br />Total job cost: $165,832 <br />(DOz-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />