Laserfiche WebLink
Spoil pile: <br />1.000 <br />Push gradient: <br />1.115 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.929 <br />Blade type: <br />1.000 <br />Net correction: 0.7365 <br />Adjusted unit production: 622.56 LCY/hr <br />Adjusted fleet production: 4980.48 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 8 Dozer(s) <br />Unit cost: $0.702/LCY <br />Total job time: 103.03 Hours <br />Total job cost: $360,278 <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />