My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-30_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2015-06-30_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:46 PM
Creation date
7/2/2015 8:47:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
6/30/2015
Doc Name
2015 Midterm Review Findings and Cost Estimate (MT7)
From
DRMS
To
Trapper Mning, Inc
Permit Index Doc Type
Findings
Email Name
TNL
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: D/E Pit Regrade (Spoil Side East) <br />Site: Trapper Mine Permit Action: MT7 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: <br />Date: 6/12/2015 County: <br />User: JLE <br />Colorado <br />Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DI IR - 11SU <br />Horsepower: <br />850 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />3 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Permit/Job#: C1981010 <br />Abbreviation: None <br />Filename: C081-004 <br />$437.09 <br />$3,496.69 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />513,158 <br />1.000 <br />513,158 LCY <br />Source of estimated volume: Permit Appendix A, Table 1.4-2 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />360 feet <br />845.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-5% <br />7,000 feet <br />2,475 lbs/LCY <br />User Provided <br />Job Condition Correction Factor <br />Utilization % <br />$90.05 <br />NA <br />$308.78 <br />100 <br />$0.00 <br />0 <br />$38.26 <br />NA <br />$437.09 <br />$3,496.69 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />513,158 <br />1.000 <br />513,158 LCY <br />Source of estimated volume: Permit Appendix A, Table 1.4-2 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />360 feet <br />845.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-5% <br />7,000 feet <br />2,475 lbs/LCY <br />User Provided <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />1.000 <br />CAT HB <br />Dozing method: <br />1.200 <br />S -BY -S <br />Visibility: <br />1.000 <br />AVG. <br />Job efficiency: <br />0.790 <br />(3 SHIFTS/DAY) <br />
The URL can be used to link to this page
Your browser does not support the video tag.