My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-17_REPORT - M1990057
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1990057
>
2015-06-17_REPORT - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:33 PM
Creation date
6/30/2015 5:09:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REPORT
Doc Date
6/17/2015
Doc Name
Report
From
Union Milling Co, LLC
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit M1990-057 <br />Leadville Mill, Union Milling Company, LLC <br />June 17, 2015 <br />Anticipated Activities: June 18, 2015 to June 17, 2016 <br />No new disturbances are planned for the Leadville Mill. Construction activities will continue within <br />the existing disturbed area to finish the tailings storage facility. Figure 6-2 is submitted showing <br />the current disturbance outline and major proposed activities within the current disturbance area. <br />UMC's planned activities for the year will occur in two phases; Phase 1 associated with <br />environmental and permit -related activities, and Phase 2 work related with construction activities <br />required to initiate mill operations. <br />Phase 1 — Environmental & Permit Activities: <br />1. Continue Ground- and Surface -water monitoring activity as required. <br />2. Seeding program of TSF embankment as required by the permit. <br />3. Continue routine care and maintenance activities as required by our 110(d) and Lake <br />County CUP permits <br />Phase 2 — Construction Activities: <br />Construction activities are dependent on our ability to raise the capital required to complete and <br />operate the mill. Depressed precious metal prices have and continue to make it difficult for UMC <br />to raise capital over the last few years, thus our delay in commissioning our plant. We are hopeful <br />that we will secure funding this year. The following activities are will occur once funds are in <br />place. <br />1 Mill equipment, replacement and repair summer 2016. <br />2 SWMP application July 2015. (No NPDES) <br />3 MSHA compliance anticipated July 2016. <br />4 TSF reconstruction anticipated completion August 2016. <br />5 Initiate mill startup August 2016. <br />6 Initiate removal of the sulfidic ore in the temporary ore stockpiles within 60 days of <br />resumption of milling operations. <br />7 No additional land will be disturbed; no additional land will be permanently reclaimed. <br />The mill disturbed area will remain at 8.1 acres. <br />
The URL can be used to link to this page
Your browser does not support the video tag.