Laserfiche WebLink
The upper portal is 500 feet of tunnel that is clear with the exception of a 15 foot section of over <br />burden at the entrance. There are no other collapses anywhere else in the mine. <br />The winz is in good shape, some old timbers will need to be replaced and some loose rock needs <br />to be cleared. Rock bolts and workings are secure and in good shape. Any work to be done on <br />the upper portal or the winz will not start till April of 2016. <br />.303-57 7�-0 <br />