Laserfiche WebLink
Job efficiency: 0.790 <br />(3 SHIFTS/DAY) <br />Spoil pile: 1.000 <br />(DOZ-OC) <br />Push gradient: 1.115 <br />(CAT HB) <br />Altitude: 1.000 <br />(CAT HB) <br />Material Weight: 0.929 <br />(CAT HB) <br />Blade type: 1.000 <br />(PAT) <br />Net correction: 0.7365 <br />Adjusted unit production: 837.18 LCY/hr <br />Adjusted fleet production: 4185.9 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 5 Dozer(s) <br />Unit cost: $0.522/LCY <br />Total job time: 59.27 Hours <br />Total job cost: $129,536 <br />