My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-26_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2015-06-26_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:43 PM
Creation date
6/26/2015 10:48:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
6/26/2015
Doc Name
Revised Reclamation Cost Estimate
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
MT7
Email Name
JLE
TNL
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Ash Disposal Pit Regrade (West) <br />Site: Trapper Mine Permit Action: MT7 Permit/Job#: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date: 6/12/2015 <br />User: JLE <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />Abbreviation: None <br />Filename: C081-001 <br />HOURLY EQUIPMENT COST <br />Source <br />(AVG.) <br />Basic Machine: Cat DI IR - I ISU <br />(S -BY -S) <br />Horsepower: 850 <br />Blade Type: Semi -Universal <br />Attachment: NA <br />Shift Basis: 3 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $90.05 <br />NA <br />Operating Cost/Hour: $308.78 <br />100 <br />Ripper op. Cost/Hour: $0.00 <br />0 <br />Operator Cost/Hour: $3826 <br />NA <br />Total unit Cost/Hour: $437.09 <br />Total Fleet Cost/Hour: $2,185.43 <br />MATERIAL QUANTITIES <br />Initial Volume: 248,109 <br />Swell factor: 1.000 <br />Loose volume: 248,109 LCY <br />Source of estimated volume: Permit Appendix A, Table 1.4-2 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />265 feet <br />1.136.7 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />-5% <br />6,800 feet <br />2.475 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 1.000 <br />Dozing method: 1.200 <br />Visibility: 1.000 <br />Source <br />(AVG.) <br />(CAT HB) <br />(S -BY -S) <br />(AVG.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.