Laserfiche WebLink
Push gradient: 0.786 <br />(CAT HB) <br />Altitude: 1.000 <br />(CAT HB) <br />Material Weight: 0.902 <br />(CAT HB) <br />Blade type: 1.000 <br />(PAT) <br />Net correction: 0.3531 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />716.09 LCY/hr <br />2864.36 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.479/LCY <br />Total job time: <br />Total job cost: <br />39.28 Hours <br />$53,841 <br />