My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-26_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2015-06-26_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:43 PM
Creation date
6/26/2015 10:48:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
6/26/2015
Doc Name
Revised Reclamation Cost Estimate
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
MT7
Email Name
JLE
TNL
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Regrad <br />Site: Trapper Mine <br />PROJECT IDENTIFICATION <br />BULLDOZER WORK <br />BC Road <br />Permit Action: MT7 <br />Task #: 030 State: Colorado <br />Date: 6/24/2015 County: Moffat <br />User: JLE <br />Agency or organization name: DRMS <br />Permit/Job#: C1981010 <br />Abbreviation: None <br />Filename: C081-030 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - IOSU <br />Horsepower: 574 <br />Blade Type: Semi -Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $120.17 <br />NA <br />Operating Cost/flour: $184.48 <br />100 <br />Ripper op. Cost/Hour: $0.00 <br />0 <br />Operator Cost/Hour: $38.01 <br />NA <br />Total unit Cost/Hour: $342.65 <br />Total Fleet Cost/Hour: $1.370.61 <br />MATERIAL OUANTITIES <br />Initial Volume: 90,015 <br />Swell factor: 1.250 <br />Loose volume: 112,519 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Appendix A, Table 1.4-5 <br />Cat Handbook <br />Average push distance: 80 feet <br />Unadjusted hourly 2,028.0 LCY/hr <br />production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 10% <br />Average site altitude: 6,400 feet <br />Material weight: 2,550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 1.000 <br />Dozing method: 1.000 <br />Visibility: 1.000 <br />Job efficiency: 0.830 <br />Spoil pile: 0.800 <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN_) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(SSD -AC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.