Laserfiche WebLink
DRILLING AND EXPLOSIVES PREPARATION TIME <br />Total Drilling Length: <br />Unadjusted Drilling Rate: <br />Drilling Time: <br />Job Condition Corrections: <br />Site Altitude: <br />Altitude Adjustment: <br />Job Efficiency Factor: <br />Adjusted Drilling Rate: <br />Explosives Prep. Time: <br />JOB TIME AND COST <br />5,004 <br />linear feet <br />82.00 <br />feet/hour <br />95.87 <br />hours <br />7,100 <br />feet <br />0.95 <br />(DRMS est.) <br />0.67 <br />(CH. Exc. HB) <br />52.19 <br />feet/hour <br />76.31 <br />hours <br />Total Job Time: 172.19 Hours <br />Unit cost: $2.414 per cu. yd. Total Job Cost: $106,800 <br />