My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-26_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2015-06-26_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:43 PM
Creation date
6/26/2015 10:48:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
6/26/2015
Doc Name
Revised Reclamation Cost Estimate
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
MT7
Email Name
JLE
TNL
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLASTING MATERIALS QUANTITIES <br />HOURLY EQUIPMENT COST <br />inti <br />Shift basis: 1 per day <br />Drilling Equipment - Drill: Atlas Capco DM45/HP - 9.0" <br />-Drill Pad Preparation: Cat D10T - 10SU <br />Misc_ Drill Support Equipment: NA <br />Misc. Explosives Support Equipment: NA <br />Explosives Delivery -Bulk Truck: Fuel Tanker, 6x4, 210 HP <br />-Cap Truck: Light Duty Pickup, 4x4, 3/4 T. <br />Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />Cost Breakdown: Eauimnent Preparation Support Support Bulk Truck Can Truck <br />QUANTITY <br />UNIT <br />Total Quantity of Stemming Required: <br />15.50 <br />cubic yards <br />Total Quantity of Explosives Required: <br />95,108 <br />pounds <br />Total Quantity of det. cord/fuse/wire Required: <br />13,649 <br />linear feet <br />Quantity of Blasting Caps per Blasthole: <br />2 <br />cap(s) <br />Total Quantity of Blasting Caps Required: <br />864 <br />caps <br />Quantity of Primers per Blasthole: <br />1 <br />primer(s) <br />Total Quantity of Primers Required: <br />432 <br />primers <br />Quantity of Delays per Blasthole: <br />3 <br />delay(s) <br />Total Quantity of Delays Required: 1 <br />1,300 <br />1 delays <br />HOURLY EQUIPMENT COST <br />inti <br />Shift basis: 1 per day <br />Drilling Equipment - Drill: Atlas Capco DM45/HP - 9.0" <br />-Drill Pad Preparation: Cat D10T - 10SU <br />Misc_ Drill Support Equipment: NA <br />Misc. Explosives Support Equipment: NA <br />Explosives Delivery -Bulk Truck: Fuel Tanker, 6x4, 210 HP <br />-Cap Truck: Light Duty Pickup, 4x4, 3/4 T. <br />Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />Cost Breakdown: Eauimnent Preparation Support Support Bulk Truck Can Truck <br />Total work team cost/hour: $675.72 <br />MATERIALS COST <br />Drilling <br />Dozer <br />Unit Cost <br />Quantity <br />MiscTruck <br />MiscTruck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />50 <br />50 <br />Ownership cost/hour: <br />$64.94 <br />$120.17 <br />NA <br />NA <br />$9.40 <br />$3.62 <br />Operating cost/hour: <br />$181.66 <br />$184.48 <br />NA <br />NA <br />$17.17 <br />$5.84 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$0.00 <br />$38.01 <br />NA <br />NA <br />$27.88 <br />$22.57 <br />Unit Subtotals: <br />$246.59 <br />$342.65 <br />$0.00 <br />$0.00 <br />$54.45 <br />$32.03 <br />Number of Units: <br />1 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />$246.59 <br />$342.65 <br />$0.00 <br />$0.00 <br />$54.45 <br />$32.03 <br />Total work team cost/hour: $675.72 <br />MATERIALS COST <br />Total Materials Cost: $43,707.41 <br />Description <br />Unit <br />Unit Cost <br />Quantity <br />Total Cost <br />Bulk ANFO nom. density ( <br />Blasting Agent: <br />7,900-15,000 fps ) <br />Pound <br />$0.234 <br />95107.725 <br />$22,255.21 <br />Cast primer, 2.0 lb (electric <br />Primers or Boosters: <br />or non -electric system) <br />Each <br />$7.226 <br />432.000 <br />$3,121.63 <br />Non -electric cap, delay <br />Blasting Caps: <br />(non -electric systems) <br />Each <br />$3.489 <br />864.000 <br />$3,014.50 <br />Det. Cord, fuse, or <br />Detaline Detacord, 2.4 <br />wire: <br />gr./ft. (Detaline system) <br />Linear foot <br />$0.140 <br />13648.800 <br />$1,910.83 <br />MS connectors (non - <br />Delays: <br />electric systems) <br />Each <br />$4.914 <br />1300.000 <br />$6,388.20 <br />NO MISCELLANEOUS <br />Miscellaneous: <br />MATERIALS REQUIRED <br />NA <br />$0.000 <br />0.000 <br />$0.00 <br />Drill bits: <br />Bit life = 1,750 <br />Linear feet <br />$2,454.00 <br />2.859 <br />$7,017.04 <br />Total Materials Cost: $43,707.41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.