My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-22_PERMIT FILE - P2015012
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2015012
>
2015-06-22_PERMIT FILE - P2015012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:36 PM
Creation date
6/23/2015 10:45:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2015012
IBM Index Class Name
PERMIT FILE
Doc Date
6/22/2015
Doc Name
Application
From
Fortune Revenue
To
DRMS
Email Name
RCO
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: <br />Permit Action: Reclamation Cost <br />Site: The Liberty Project Estimate <br />PROJECT IDENTIFICATION <br />Task #: O l A State: Colorado <br />Date: 6/11/2015 County: Ouray <br />__.. ..__.._...----- <br />User: THM <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Pagel of 2 <br />Petmit/Job#: P2015012 <br />Abbreviation: None <br />Filename: P012 -01a <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND IOOT) <br />Cost Breakdown: <br />Available Rig Capacities <br />= 0-25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: ! <br />$16.63 <br />$18.37 <br />$22.33 <br />Opera Cost/Hour: <br />1 $44.38 ! <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />_ Helper Cost/Hour: <br />$0.00 <br />$25.39 j <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />r Machine _� Weight/ Owner ship <br />Haul Rig <br />Fleet Haul Trip <br />Return Trip DOT Permit <br />Description Unit Cost/hr/ unit <br />Cost/hr/unit <br />Size Cost/hr/ <br />Cost/hr/ fleet Cost/ fleet <br />_ (TONS) <br />l <br />fleet <br />Cat 336D L 10'-6" <br />_ _ <br />32.23 $38.17 <br />$117.55 <br />1 <br />$155.72 <br />$117.55 <br />$250.00 <br />Stick <br />CAT 246C <br />3.58 1 $6.84 <br />$88.67 <br />1 1 <br />$95.51 <br />$88.67 <br />$250.00 <br />Drill/Broadcast <br />25.00 1 $39.59 <br />$88.67 <br />1 1 <br />$128.26 <br />$88.67 <br />$250.00 <br />Seeder with Tractor <br />Subtotals: 1 $379.49 1 $294.89 1 $750.00 <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ unit Fleet Size Haul Trip . Return Trip <br />Cost/hr/ fleet LCost/hr/ fleet <br />Subtotals: [--$0.00 $0.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.