Laserfiche WebLink
June 15, 2015 C-2009-087/Peabody Sage Creek Mine JLE <br />Figure 2. Intersection of SIIPM-6a and SIIPM-6 <br />• Culvert SC -26 is half full of sediment at the inlet and needs to be cleaned out. <br />• Rip -rap has sloughed off the erosion control liner along portions of the SIIPM-6 channel. <br />Figure 3. SIIPM-6 channel, rip -rap sloughed off channel liner <br />GENERAL MINE PLAN COMPLIANCE: <br />The mine portals were sealed and inactive at the time of the inspection. <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 4 of 10 <br />