Response: The 8-8' cross section has been redrawn. <br />6. Map 12 shows the Taylor Tributary Ditch as being constructed from approximately stations 0+00 <br />to 15+00 and stations 26+00 to 35+00, with the remaining stations being shown as "future" <br />construction. It is the Division's belief that this ditch has been constructed from stations 0+00 to <br />40+00. Please review the Taylor Tributary Ditch as it is shown on Map 12 and correct as <br />necessary (please note, some portions of the ditches carry over to Map 12A, which will also need <br />to be reprinted and resent). <br />Response: The Taylor Tributary Ditch has been completed through Station 40+00. <br />Maps 12 and 12A have been modified and resubmitted in response to this and other <br />related comments. <br />7. Map 12 shows the Taylor Ditch as being "future" construction. It is the Division's belief that <br />this ditch has been constructed in its entirety. Please review the Taylor Ditch as it is shown on <br />Map 12 and correct as necessary (please note, some portions of the ditches carry over to <br />Map 12A, which will also need to be reprinted and resent). <br />Response: Taylor Ditch has been completed. Maps 12 and 12A have been modified <br />and resubmitted in response to this and other related comments. <br />8. Map 12 shows the East Taylor Ditch as being constructed from approximately stations 20+00 to <br />34+00, with the remaining stations being shown as "future" construction. It is the Division's belief <br />that this ditch has been constructed from stations 0+00 to 43+00. Please review the East Taylor <br />Ditch as it is shown on Map 12 and correct as necessary (please note, some portions of the <br />ditches carry over to Map 12A, which will also need to be reprinted and resent). <br />Response: This ditch has been completed from Station 0+00 through 43+00. Maps 12 <br />and 12A have been modified and resubmitted in response to this and other related <br />comments. <br />9. Map 12 shows the Prospect Ditch as being constructed from approximately stations 0+00 to <br />6+00 and with the remaining stations being shown as "future" construction. It is the Division's <br />belief that this ditch has been constructed in its entirety. Please review the Prospect Ditch as it <br />is shown on Map 12 and correct as necessary (please note, some portions of the ditches <br />carry over to Map 12A, which will also need to be reprinted and resent). <br />Response: Prospect Ditch has been completed. Maps 12 and 12A have been modified <br />and resubmitted in response to this and other related comments. <br />10. Map 12 shows the North Tributary, East Pit Ditch as being constructed from approximately <br />stations 0+00 to 6+00 and with the remaining stations being shown as "future" construction. It is the <br />Division's belief that this ditch has been constructed in its entirety. Please review the North <br />Tributary, East Pit Ditch as it is shown on Map 12 and correct as necessary (please note, <br />some portions of the ditches carry over to Map 12A, which will also need to be reprinted <br />and resent). <br />Page 2 <br />