My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-15_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-06-15_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:30 PM
Creation date
6/16/2015 3:19:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/15/2015
Doc Name
CQA Report week ending 05/20/3015
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co.` <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />I) Field Activities: <br />The following activities were observed: Placement and compaction of the, Phase 1 Structural Fill <br />materials, placement and compaction of Soil Liner Fill materials, pump mnitoring at the LVSCS riser <br />pipes, tertiary underdrain construction, subgrade acceptance, soil liner fil acceptance and remediation of <br />underground workings. <br />II) Laboratory Activities: <br />Concrete testing, atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. <br />Nine resin lots of geogrid was shipped to TRI for conformance testing. <br />The following samples were collected: Phase 1 - Soil Liner Fill-, 1-SLF-9=R <br />Cameron - Soil Liner Fill-, SLF-181-C <br />General Proiect Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held May 27, 2015 (Amec Foster Wheeler, CC&V, Ames). Amec: <br />Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br />Contractor Meeting. <br />Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&' <br />Wheeler, and Ames. <br />Deliveries: None, <br />CQA Monitor <br />Submitted by: <br />Bobby Redd, EI <br />Project Resident <br />Reviewed by: <br />CC&V Projects <br />Reviewed By: <br />Projects, Amec Foster <br />Date: June 3, 2015 <br />Date: <br />Date: 4-11011-!5 <br />Reviewed By: I Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.