My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-15_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-06-15_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:30 PM
Creation date
6/16/2015 3:19:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/15/2015
Doc Name
CQA Report week ending 05/20/3015
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. AT <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125NO <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: May 30, 2015 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 5.24.2015 through 5.30.2015 <br />Days <br />S <br />I M <br />I T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D=Day Shift N=Night Shift W= Weather <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 43°F to 59°F Cloud Cover: Clear to cloudy <br />Lows: 30°F to 39°F Precipitation: Rain/Snow <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Note: An Amec Foster Wheeler field professional monitored fill material temperatures during fill <br />placement; average structural fill temperatures were above 32°F. All construction materials <br />placed were verified as suitable, and construction methods were in accordance with project <br />technical specifications. <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred.- <br />Cat <br />ccurred:Cat dozers graded the slope below stations D6+00 to D10+00 and the ADR Haul Road. <br />Cat dozers finish graded the slope beneath the ball mill in the vicinity of stations HM16+00 to <br />HM18+00 and JM15+00 to JM17+00 and FM14+00 to FM16+00. <br />Cat dozers graded slopes between stations K8+00 to K12+00 and M2+00 to M6+00 and M8+00 <br />to M14.00. Cat smooth drum rollers compacted the subgrade area. <br />Cat smooth drum rollers compacted subgrade between stations G6+00 to G8+00 and E10+00 <br />and E15+00. <br />Cat dozers graded the slope between stations 15+00 and 18+00 and 112+00 to 116+00 and <br />K10+00 to K12+00. A Cat smooth drum roller compacted the fill area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.